Custom blower wheels and impellers for OEM equipment.

OEM Blower Wheel Dimension & RFQ Worksheet

Use this engineering checklist to document outside diameter, width/length, hub bore, axial offset, and CW/CCW rotation without measurement ambiguity—or copy our 1-minute text template directly into your quote request.

Blower wheel OD, width, hub bore, and rotation measurement reference
Standard centrifugal wheel OD, width, bore, and rotation viewing datums.
24 hEngineering reply

Complete RFQs receive DFM, tooling, and unit price feedback in 1 business day.

PDF / STEPCAD & cloud links

Attach PDF, STEP, DWG, DXF, or paste Google Drive / Dropbox / WeTransfer links.

7–15 daysPrototype build

Locked 2D approval drawing signed off before every custom sample run.

NDA ReadyIP confidentiality

Mutual NDA available under Dongguan Linyue Electric Technology Co., Ltd.

Part 1: Centrifugal wheel measurement datums (forward, DIDW, backward & oven)

Measure metal-to-metal with calipers on an undamaged section of the wheel. State all values in millimeters (mm) or inches (in).

Datum codeDimension nameHow to measure accuratelyCommon mistake to avoid
ODOutside diameterAcross the outer circumference of the blade ring or backplate through the center axis.Measuring across a bent rim or excluding blade tip projection on open impellers.
IDInlet ring inside diameterInside opening of the front Venturi/inlet ring (controls overlap with your housing inlet cone).Omitting ID when replacing shrouded backward-curved or STG tablock wheels.
W / HBlade width / wheel heightRim-to-backplate height (single inlet) or total rim-to-rim width (double inlet DIDW), excluding hub projection.Mixing up active blade width with overall hub-face-to-hub-face width.
Bore & KeyShaft bore, keyway & set screwInside hub diameter (e.g., 12.70 mm / 0.500", 14.00 mm H7), keyway width × depth (e.g., 5×2.3 mm) or D-flat, and set-screw thread.Measuring a worn or flared bore tip instead of the clean motor shaft diameter.
OffsetHub position & protrusionSpecify whether the hub boss protrudes inside the wheel cavity (concave), outside toward the motor (convex), or flush, plus mm protrusion from backplate.Assuming all hubs sit flush—wrong hub offset makes the wheel rub the scroll wall.
CW / CCWRotation + viewing sideState CW or CCW AND explicitly write “viewed from hub/motor side” or “viewed from open inlet side.”Writing “CW” alone—CW viewed from the hub side is CCW viewed from the inlet!

Part 2: Cross-flow (tangential) rotor measurement datums

Cross-flow wheels have two distinct end interfaces—a motor drive end and a bearing support end. Always document left and right ends separately.

Datum codeDimension nameWhat to record
ØDRotor outside diameterStandard die diameters include 30, 40, 43, 50, 60, 65, 80, 90, 97, 105, 110, 120, and 125 mm.
L1 (Active)Active blade cylinder lengthLength across the aluminum blade sections from outer end-disc to outer end-disc (excluding shafts/bushings; typically 106–800 mm).
L2 (Overall)Total end-to-end lengthTotal length including both protruding shaft stubs or end-bearing assemblies, plus number of intermediate stiffening discs.
Drive EndMotor coupling interfaceInternal hub bore, D-shaft flat, external stub shaft diameter × length, or 3-bolt elastomer coupling pattern.
Support EndIdle bearing endBearing pin diameter × length (e.g., Ø6 mm / Ø8 mm stainless pin) and whether you need the rubber sleeve bearing assembly included.

Part 3: Copy-paste OEM RFQ specification template

Copy the checklist below, fill in the values you have (leave unknown lines as TBD), and paste it into our quote form or email it with your drawing/photos to jaron@tslindustry.com.

Plain-Text Engineering RFQ Block
1. Wheel Type: [Forward Curved / Double Inlet DIDW / Backward Curved / Cross-Flow / Oven Impeller]
2. Source Data: [2D/3D Drawing attached / Sample photos attached / Cloud CAD link: ___ ]
3. Outside Diameter (OD) x Width or Active Length: [ ___ mm x ___ mm ]
4. Hub / Shaft Interface: [ Bore ___ mm, Keyway/D-flat ___, Hub offset ___ mm (or Drive/Support ends) ]
5. Rotation & Viewing Side: [ CW / CCW viewed from Hub/Motor side (or Inlet side) ]
6. Material & Finish: [ Galvanized SGCC / 304 SS / 316L SS / Aluminum + E-coat ]
7. Operating Speed & Temp: [ ___ RPM, Normal/Max ___ °C, Balance grade: ISO 1940 G6.3 / G2.5 ]
8. Quantity & Destination: [ Prototype: ___ pcs | Batch/Annual: ___ pcs | Country: ___ ]

Measurement & RFQ submission FAQs

How is blower wheel rotation (CW vs. CCW) standardized?

Always state the viewing side together with CW or CCW. In North American HVAC practice, single-inlet centrifugal rotation is commonly specified viewing from the closed hub/drive backplate side (opposite the open air inlet)—meaning a wheel looks opposite when viewed from the open inlet ring. Marking a curved arrow directly on a hub-side photo eliminates all ambiguity.

What is the difference between active blade length and overall length on a cross-flow wheel?

Active blade length measures only the cylindrical louvered rotor between the two outer end discs (excluding hubs, rubber bushings, and shaft stubs). Overall assembly length measures from the tip of the motor drive shaft to the tip of the opposite bearing pin.

What file formats can I attach or link in my RFQ?

Our quote form accepts PDF, STEP, STP, IGS, DWG, DXF, ZIP, JPG, PNG, and WebP files up to 10 MB. For larger 3D assemblies, paste a Google Drive, Dropbox, OneDrive, SharePoint, or WeTransfer link directly into the requirements box.

Do I need every single dimension filled in before requesting a quote?

No. Outside diameter, width/length, shaft bore, material preference, and estimated quantity are enough for an initial budget and die-compatibility check. Mark unknown tolerances or balance grades as ‘TBD’ and our engineers will propose standard OEM values.

Have your drawing or measurements ready?

Submit your specs through the quote form or email jaron@tslindustry.com—our Dongguan engineers confirm tooling, 7–15 day prototype timing, and batch pricing within 24 hours.

Sample Photo Guide